Customization: | Available |
---|---|
Task: | Program |
Structure: | Combination |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | IES 258-3/1W | IES 258-5/1W | IES 258-10/1W |
Code | 22100001 | 22100002 | 22100003 |
Minimum switch-on time for the J signal: |
8s | 10s | 15s |
Mains voltage: |
230 V AC, -15/+10%, 50 Hz, for earthed and non-earthed systems. |
Power consumption: | Approx. 19 VA (7W).Output voltage for valve and ignition transformer = Mains voltage. |
Output current: |
Max. 2 A per output, total current max. 2.5 A. |
Fuse in the unit: |
3.15 A, slow-blow H, to IEC 127-2/5. |
Flame control: |
Ionization sensor or UV sensor. |
Sensor voltage or voltage at UV sensor: | Approx. 230 V AC. |
with UV control: | Max. 100 m |
The average number of operating cycles as a function of power factor cos j: | Approx. 1 x 106, with single-electrode operation:270000 |
Valve connections: | 1 |
Ambient temperature: |
-20°C to +60°C, no moisture condensation admissible. |
Enclosure: | IP40 to IEC 529 |
in the area of the measuring sockets: | IP30 |
Construction: |
Housing made of impact and heat-resistant plastic, the plug-in upper section with operating controls and indicators.Bottom section with connection terminals, earth, and pre-wired neutral bus with generous cable space. |
Weight: | 0.51kg |