Task: | Program |
---|---|
Structure: | Combination |
Mathematical Model: | Linear |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
LOA24.171B27 fuel combustion controller Mechanical combustion controller monitoring, starting, and controlling intermittent operation of single or double stage forced ventilation fuel burners (less than 30Kg/h) Yellow flame adopts QRB... flame detector The blue flame adopts QRC... flame detector Installation precautions: 1. Ensure that the installation of phase and zero lines is correct. 2. The controller operates in an intermittent control mode and needs to ensure a minimum of one shutdown within 24 hours. When installing the controller, it is necessary to ensure that the power is disconnected. 4. Normal temperature can extend the service life of the controller. 5. It should comply with local standards for electrical installation. 6. Controllers using DC power must pay attention to the correct installation of polarity. Before starting the system, it is necessary to check if the connection is correct. 8. Ensure good wiring. 9. Avoid connecting the Phototube cable to the power supply. 10. Before normal operation, Phototube sensitivity will lead to ignition failure. After the 11 fault is locked, wait for 10 seconds before resetting. |
Suppliers with verified business licenses